MAKO FinCaps and GFRP rebar provide a complete non-metal solution required for this pour in Nebraska. The FinStands and Base are completely non-metal and can be used in any configuration.
Related Projects
SLOPED BRIDGE DECK at LAX AIRPORT
The MAKO FinCaps and FinStands were used on the bridge decks for the Crenshaw LAX Transit Project in 2016. The…
WHAT IS FF and FL?
What are F-Numbers? ACI 117 is the industry standard for specification and measurement of concrete floor flatness (FF) and floor levelness…
SUPER THICK FLOORS
MAKO Screed Support Systems and the Lura Lightning Strike Roller Screed have continuously achieved high FF/FL numbers on many industrial…
DOUBLE MAT
Double Mat is no challenge for the MAKO Screed Support Systems. This 3' (1 m) foundation used a FinCap mounted…